{"id":4436,"date":"2025-06-19T14:00:28","date_gmt":"2025-06-19T11:00:28","guid":{"rendered":"https:\/\/turunraitiotie.fi\/?page_id=4436"},"modified":"2026-05-18T13:24:57","modified_gmt":"2026-05-18T10:24:57","slug":"about-the-tramway","status":"publish","type":"page","link":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/","title":{"rendered":"About the tramway"},"content":{"rendered":"\t\t<div class=\"hero hero-50 position-relative bg-bright-yellow\">\n\t\t\t<div class=\"container h-100\">\n\t\t\t\t<div class=\"row h-100 align-items-md-center\">\n\t\t\t\t\t<div class=\"col-12 col-md-5\">\n\t\t\t\t\t\t<h1 class=\"page-title pb-2\">About the tramway<\/h1>\n\t\t\t\t\t\t<p class=\"page-subtitle\">Now underway is the final planning phase of the tramway before possible construction.<\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"col-12 col-md-6 offset-md-1 px-0\" aria-hidden=\"true\">\n\t\t\t\t\t\t<div class=\"hero-img-wrap\">\n\t\t\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/12\/Group-147.png\" alt=\"\" class=\"w-100\" loading=\"eager\" aria-hidden=\"true\"\/>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\n\n\t\t<div class=\"container\">\n\t\t\t<div class=\"breadcrumb mt-4 mb-0\">\n\t\t\t<a href=\"https:\/\/turunraitiotie.fi\/en\/\">Homepage<\/a> <p>><\/p><p>About the tramway<\/p>\t\t\t\t\n\t\t<\/div>\n\t<\/div>\n\t\n\n\n\n<section class=\"text-field pt-4 container\" >\n\t<div class=\"row justify-content-center\">\n\t\t<div class=\"col-12 col-md-10 col-lg-8\">\n\t\t<h2>The tramway is a way for a growing city to manage and guide its growth. The tramway is a high-capacity public transportation system that is part of the F\u00f6li.<\/h2>\n<h3>Turku&#8217;s tram line runs through the growing city, from Linnakaupunki through the city center and Kupittaa to Varissuo.<\/h3>\n<p>Along the 12-kilometer route are homes, workplaces, schools, educational institutions, recreational and sports facilities, and city services. The route also includes train stations and the port, through which thousands of passengers pass every day.<\/p>\n<h3>The tramway would be part of the F\u00f6li.<\/h3>\n<p>The tramway would complement public transportation in Turku and serve as one of F\u00f6li\u2019s trunklines. Passengers could use the same ticket as on the buses.<\/p>\n<h3>The stops serve residents, workplaces, and services both now and in the future.<\/h3>\n<p>There will be 20 accessible stops along the line. The average distance between stops is 600 meters.<\/p>\n<h3>A tram can carry nearly as many passengers as three buses.<\/h3>\n<p>A tram can carry 220\u2013260 passengers. The trams are accessible. The trams have spacious interiors with plenty of seating as well as room for wheelchairs and strollers. A total of 14 trams will be purchased.<\/p>\n<h3>The tram is fast and runs frequently.<\/h3>\n<p>The trams run every 7.5 minutes. Market Square\u2013Port 13 min. Market Square\u2013Kupittaa 10 min. Kupittaa\u2013Varissuo 14 min. From terminal to terminal 37 min.<\/p>\n<h3>With the tramway, Turku will gain 12 kilometers of new, pleasant, and functional urban environment.<\/h3>\n<p>With the tramway, the streets along the route will be renovated from wall to wall, including underground. In Turku, public transit lanes will be built, sidewalks will be improved, high-quality bike lanes will be constructed, roadways will be renovated, and pavement will be replaced. The amount of street greenery and trees will increase on Turku\u2019s streets.<\/p>\n<h3>By 2050, one in three Turku residents and nearly half of all workplaces will be located along the tram route.<\/h3>\n<p>Currently, one in four Turku residents lives along the line. The line connects Turku\u2019s growing areas and key urban development zones, such as Linnakaupunki, the city center, and Science Park.<\/p>\n<h3>If the decision is made to build the tramway, tram service in Turku would begin in 2033.<\/h3>\n<p>Before tram service begins in Turku, the tramway must be built. All streets along the entire 12-kilometer tram line will be renovated, archaeological surveys will be conducted, and trams suitable for Turku will be procured.<\/p>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n\n\n<section class=\"text-large-img-cols styled d-flex flex-wrap align-items-center bg-yellow ptb-80\" >\n\t\t<div class=\"container\">\n\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"col-12 col-lg-5 align-self-center order-2 order-lg-1 \">\n\t\t\t\t\t<h2 class=\"section-title\">Tramline<\/h2>\n\n\t\t\t\t\t<p>Turku&#8217;s tram line runs through the growing city, from Linnakaupunki through the city center and Kupittaa to Varissuo.<\/p>\n\n\t\t\t\t\t\n\t\t\t\t\t\t<div class=\"mt-5\"><a role=\"link\" target=\"\" class=\"cta\" href=\"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/tramline-and-stops\/\">Tramline and stops<\/a><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t<div class=\"col-12 col-lg-6 order-1 mb-4 mb-lg-0 order-lg-2 offset-lg-1\" aria-hidden=\"true\">\n\t\t\t\t\t<div class=\"img-wrapper img-cover\">\n\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1281\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/Hameenkatu_1920px.jpg\" class=\"attachment-1280\/1280 size-1280\/1280\" alt=\"\" srcset=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/Hameenkatu_1920px.jpg 1920w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/Hameenkatu_1920px-640x427.jpg 640w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/Hameenkatu_1920px-1280x854.jpg 1280w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/Hameenkatu_1920px-320x214.jpg 320w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/Hameenkatu_1920px-768x512.jpg 768w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/Hameenkatu_1920px-1536x1025.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n<\/section>\n\n\n\n<section class=\"news mtb-80\">\n\t<div class=\"container arts overflow-hidden\">\n\t\t \n\t\t\t<div class=\"col-12 col-md-6\">\n\t\t\t\t<h2 class=\"section-title\">News<\/h2>\n\t\t\t<\/div>\n\t\t\n\t\t<div class=\"row\">\n\t\t\t        <div class=\"col-12 col-md-6 col-lg-4 pb-2\">\n            <div class=\"hls h-100\">\n                <a class=\"link-arts\" href=\"https:\/\/turunraitiotie.fi\/en\/turku-tramway-alliance-gets-the-go-ahead-to-build-a-12-kilometre-tramway-line-in-turku-tram-services-will-resume-in-turku-in-2033\/\" aria-label=\"Read entire article:\">\n                    <div class=\"img-wrapper mb-3\" aria-hidden=\"true\">\n                        <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-1280x960.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" srcset=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-1280x960.jpg 1280w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-640x480.jpg 640w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-320x240.jpg 320w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-768x576.jpg 768w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-1536x1152.jpg 1536w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                    <\/div>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"info-wrap\" aria-hidden=\"true\">\n\t\t\t\t\t\t<span class=\"blog-cat\">News<\/span><span aria-hidden=\"true\" class=\"date-separator\"> | <\/span>\n\t\t\t\t\t\t<span class=\"post-date pb-3\">\n\t\t\t\t\t\t\t18.5.2026\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\n                    <h3 class=\"post-hls-title pb-1\">Turku Tramway Alliance gets\u00a0the go-ahead\u00a0to build a 12-kilometre tramway line in Turku \u2013 tram services will resume in Turku in 2033<\/h3>\n\n                    <p class=\"post-excerpt\" aria-hidden=\"true\">\n                        Turku City Council has decided to commission the Turku Tramway Alliance to build a tramway in Turku. The tramway will be constructed in accordance with the Alliance\u2019s implementation plan and a binding target cost&#8230;                    <\/p>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"mb-3\" aria-hidden=\"true\" style=\"margin-top: auto;\">\n\t\t\t\t\t\t<span class=\"link-read-more\">\n\t\t\t\t\t\t\tRead article\t\t\t\t\t\t<\/span>\n                \t<\/div>\n                <\/a>\n\n                \n            <\/div>\n        <\/div>\n                <div class=\"col-12 col-md-6 col-lg-4 pb-2\">\n            <div class=\"hls h-100\">\n                <a class=\"link-arts\" href=\"https:\/\/turunraitiotie.fi\/en\/come-and-hear-about-the-turku-tramway\/\" aria-label=\"Read entire article:\">\n                    <div class=\"img-wrapper mb-3\" aria-hidden=\"true\">\n                        <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"360\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/11\/IMG_8633-1280x720.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"Nainen hymyilee ty\u00f6kaverille\" srcset=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/11\/IMG_8633-1280x720.jpg 1280w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/11\/IMG_8633-640x360.jpg 640w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/11\/IMG_8633-768x432.jpg 768w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/11\/IMG_8633.jpg 1460w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                    <\/div>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"info-wrap\" aria-hidden=\"true\">\n\t\t\t\t\t\t<span class=\"blog-cat\">News<\/span><span aria-hidden=\"true\" class=\"date-separator\"> | <\/span>\n\t\t\t\t\t\t<span class=\"post-date pb-3\">\n\t\t\t\t\t\t\t8.9.2025\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\n                    <h3 class=\"post-hls-title pb-1\">Come and hear about the Turku Tramway<\/h3>\n\n                    <p class=\"post-excerpt\" aria-hidden=\"true\">\n                        We have published preliminary street plans for the entire 12 km of the tramway route from the ferry terminal via the city centre and Kupittaa to Varissuo. You can also comment on the plans in the map-based survey&#8230;                    <\/p>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"mb-3\" aria-hidden=\"true\" style=\"margin-top: auto;\">\n\t\t\t\t\t\t<span class=\"link-read-more\">\n\t\t\t\t\t\t\tRead article\t\t\t\t\t\t<\/span>\n                \t<\/div>\n                <\/a>\n\n                \n            <\/div>\n        <\/div>\n                <div class=\"col-12 col-md-6 col-lg-4 pb-2\">\n            <div class=\"hls h-100\">\n                <a class=\"link-arts\" href=\"https:\/\/turunraitiotie.fi\/en\/preliminary-street-plans-for-the-turku-tramway-project-have-been-published-feedback-from-residents-will-be-collected-with-a-survey\/\" aria-label=\"Read entire article:\">\n                    <div class=\"img-wrapper mb-3\" aria-hidden=\"true\">\n                        <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"427\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/eerikinkatu_havainnekuva_2025_turun-raitiotie_1920px-1280x854.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" srcset=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/eerikinkatu_havainnekuva_2025_turun-raitiotie_1920px-1280x854.jpg 1280w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/eerikinkatu_havainnekuva_2025_turun-raitiotie_1920px-640x427.jpg 640w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/eerikinkatu_havainnekuva_2025_turun-raitiotie_1920px-320x214.jpg 320w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/eerikinkatu_havainnekuva_2025_turun-raitiotie_1920px-768x512.jpg 768w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/eerikinkatu_havainnekuva_2025_turun-raitiotie_1920px-1536x1025.jpg 1536w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/09\/eerikinkatu_havainnekuva_2025_turun-raitiotie_1920px.jpg 1920w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                    <\/div>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"info-wrap\" aria-hidden=\"true\">\n\t\t\t\t\t\t<span class=\"blog-cat\">News<\/span><span aria-hidden=\"true\" class=\"date-separator\"> | <\/span>\n\t\t\t\t\t\t<span class=\"post-date pb-3\">\n\t\t\t\t\t\t\t8.9.2025\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\n                    <h3 class=\"post-hls-title pb-1\">Preliminary street plans for the Turku Tramway project have been published \u2013 feedback from residents will be collected with a survey<\/h3>\n\n                    <p class=\"post-excerpt\" aria-hidden=\"true\">\n                        Preliminary street plans for the Turku Tramway can be commented in the map-based survey from 8 to 28 September. The preliminary plans show how streets along the route would change if the tramway is decided to be &#8230;                    <\/p>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"mb-3\" aria-hidden=\"true\" style=\"margin-top: auto;\">\n\t\t\t\t\t\t<span class=\"link-read-more\">\n\t\t\t\t\t\t\tRead article\t\t\t\t\t\t<\/span>\n                \t<\/div>\n                <\/a>\n\n                \n            <\/div>\n        <\/div>\n        \n\t\t<\/div>\n\t\t\n\t\t\t\t<div class=\"py-3\">\n\t\t\t<a class=\"cta\" href=\"https:\/\/turunraitiotie.fi\/en\/homepage\/news\/\">\n\t\t\t\tAll news\t\t\t<\/a>\n\t\t<\/div>\n\t\t\t<\/div>\n<\/section>\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":4466,"parent":1142,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-4436","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>About the tramway - Turun raitiotie<\/title>\n<meta name=\"description\" content=\"Public transport in a growing city must be developed in bigger leaps.\u00a0We are planning a tramway as to be a part of the F\u00f6li.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"About the tramway - Turun raitiotie\" \/>\n<meta property=\"og:description\" content=\"Public transport in a growing city must be developed in bigger leaps.\u00a0We are planning a tramway as to be a part of the F\u00f6li.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/\" \/>\n<meta property=\"og:site_name\" content=\"Turun raitiotie\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-18T10:24:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/08\/Copy-of-Folin-video-Turku-raiteilla-kestavaan-kasvuun-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/homepage\\\/about-the-tramway\\\/\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/homepage\\\/about-the-tramway\\\/\",\"name\":\"About the tramway - Turun raitiotie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/homepage\\\/about-the-tramway\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/homepage\\\/about-the-tramway\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/Copy-of-Folin-video-Turku-raiteilla-kestavaan-kasvuun-1.jpg\",\"datePublished\":\"2025-06-19T11:00:28+00:00\",\"dateModified\":\"2026-05-18T10:24:57+00:00\",\"description\":\"Public transport in a growing city must be developed in bigger leaps.\u00a0We are planning a tramway as to be a part of the F\u00f6li.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/homepage\\\/about-the-tramway\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/homepage\\\/about-the-tramway\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/homepage\\\/about-the-tramway\\\/#primaryimage\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/Copy-of-Folin-video-Turku-raiteilla-kestavaan-kasvuun-1.jpg\",\"contentUrl\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/Copy-of-Folin-video-Turku-raiteilla-kestavaan-kasvuun-1.jpg\",\"width\":1280,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/homepage\\\/about-the-tramway\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Etusivu\",\"item\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Homepage\",\"item\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"About the tramway\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/\",\"name\":\"Turun raitiotie\",\"description\":\"Kasvavan kaupungin joukkoliikennett\u00e4 t\u00e4ytyy kehitt\u00e4\u00e4 isommin harppauksin. Suunnittelemme raitiotiet\u00e4 osaksi F\u00f6li\u00e4.\",\"publisher\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#organization\",\"name\":\"Turun Raitiotie\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/Raitiotie_Logo_keltainen_LOWRES.png\",\"contentUrl\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/Raitiotie_Logo_keltainen_LOWRES.png\",\"width\":300,\"height\":300,\"caption\":\"Turun Raitiotie\"},\"image\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"About the tramway - Turun raitiotie","description":"Public transport in a growing city must be developed in bigger leaps.\u00a0We are planning a tramway as to be a part of the F\u00f6li.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/","og_locale":"en_US","og_type":"article","og_title":"About the tramway - Turun raitiotie","og_description":"Public transport in a growing city must be developed in bigger leaps.\u00a0We are planning a tramway as to be a part of the F\u00f6li.","og_url":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/","og_site_name":"Turun raitiotie","article_modified_time":"2026-05-18T10:24:57+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/08\/Copy-of-Folin-video-Turku-raiteilla-kestavaan-kasvuun-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/","url":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/","name":"About the tramway - Turun raitiotie","isPartOf":{"@id":"https:\/\/turunraitiotie.fi\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/#primaryimage"},"image":{"@id":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/#primaryimage"},"thumbnailUrl":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/08\/Copy-of-Folin-video-Turku-raiteilla-kestavaan-kasvuun-1.jpg","datePublished":"2025-06-19T11:00:28+00:00","dateModified":"2026-05-18T10:24:57+00:00","description":"Public transport in a growing city must be developed in bigger leaps.\u00a0We are planning a tramway as to be a part of the F\u00f6li.","breadcrumb":{"@id":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/#primaryimage","url":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/08\/Copy-of-Folin-video-Turku-raiteilla-kestavaan-kasvuun-1.jpg","contentUrl":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2025\/08\/Copy-of-Folin-video-Turku-raiteilla-kestavaan-kasvuun-1.jpg","width":1280,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/turunraitiotie.fi\/en\/homepage\/about-the-tramway\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Etusivu","item":"https:\/\/turunraitiotie.fi\/en\/"},{"@type":"ListItem","position":2,"name":"Homepage","item":"https:\/\/turunraitiotie.fi\/en\/"},{"@type":"ListItem","position":3,"name":"About the tramway"}]},{"@type":"WebSite","@id":"https:\/\/turunraitiotie.fi\/en\/#website","url":"https:\/\/turunraitiotie.fi\/en\/","name":"Turun raitiotie","description":"Kasvavan kaupungin joukkoliikennett\u00e4 t\u00e4ytyy kehitt\u00e4\u00e4 isommin harppauksin. Suunnittelemme raitiotiet\u00e4 osaksi F\u00f6li\u00e4.","publisher":{"@id":"https:\/\/turunraitiotie.fi\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/turunraitiotie.fi\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/turunraitiotie.fi\/en\/#organization","name":"Turun Raitiotie","url":"https:\/\/turunraitiotie.fi\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/turunraitiotie.fi\/en\/#\/schema\/logo\/image\/","url":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/06\/Raitiotie_Logo_keltainen_LOWRES.png","contentUrl":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/06\/Raitiotie_Logo_keltainen_LOWRES.png","width":300,"height":300,"caption":"Turun Raitiotie"},"image":{"@id":"https:\/\/turunraitiotie.fi\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/pages\/4436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/comments?post=4436"}],"version-history":[{"count":12,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/pages\/4436\/revisions"}],"predecessor-version":[{"id":7986,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/pages\/4436\/revisions\/7986"}],"up":[{"embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/pages\/1142"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/media\/4466"}],"wp:attachment":[{"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/media?parent=4436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}