{"id":9130,"date":"2026-09-28T15:44:42","date_gmt":"2026-09-28T12:44:42","guid":{"rendered":"https:\/\/turunraitiotie.fi\/?p=9130"},"modified":"2026-09-28T16:17:27","modified_gmt":"2026-09-28T13:17:27","slug":"the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed","status":"publish","type":"post","link":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/","title":{"rendered":"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed"},"content":{"rendered":"\n\n\n\t\t<div class=\"hero hero-50 position-relative bg-bright-yellow\">\n\t\t\t<div class=\"container h-100\">\n\t\t\t\t<div class=\"row h-100 align-items-md-center\">\n\t\t\t\t\t<div class=\"col-12 col-md-5\">\n\t\t\t\t\t\t<h1 class=\"page-title pb-2\">News<\/h1>\n\t\t\t\t\t\t<p class=\"page-subtitle\"><\/p>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"col-12 col-md-6 offset-md-1 px-0\" aria-hidden=\"true\">\n\t\t\t\t\t\t<div class=\"hero-img-wrap\">\n\t\t\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-1280x720.jpg\" alt=\"\" class=\"w-100\" loading=\"eager\" aria-hidden=\"true\"\/>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\n\n\t\t<div class=\"container\">\n\t\t\t<div class=\"breadcrumb mt-4 mb-0\">\n\t\t\t<p>The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed<\/p>\t\t\t\t\n\t\t<\/div>\n\t<\/div>\n\t\n\n\n\n<section class=\"text-field pt-4 container\" >\n\t<div class=\"row justify-content-center\">\n\t\t<div class=\"col-12 col-md-10 col-lg-8\">\n\t\t<h1>The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed<\/h1>\n<p><em>The parties to the Turku Tramway Alliance have signed an agreement on the implementation phase of the Turku tramway on 28 September 2026. Construction will begin in the Turku Cathedral Bridge area in early 2027, and trams will return to Turku in 2033.<\/em><\/p>\n<p>The implementation phase alliance agreement covers two construction phases of the tramway, with the transition to the second phase expected to be confirmed in 2028.<\/p>\n<p>The first implementation phase of the Turku tramway covers construction in the Turku Cathedral Bridge (Tuomiokirkkosilta) area in 2027\u20132028, as well as the tramway\u2019s design costs. The estimated cost of this phase is 33.3 million euros. At the same time, extensive archaeological excavations will be carried out, with an estimated cost of 15.1 million euros. These sums are included in the tramway\u2019s total cost estimate of 465.2 million euros.<\/p>\n<p>During the second implementation phase, from 2028 to 2032, the tramway will be built, with all streets along the route being upgraded over the entire 12-kilometre stretch. The Turku City Council\u2019s decision on the tramway in May was conditional upon state funding. The second phase of implementation is expected to begin in 2028, once state funding has been secured. Tram services in Turku will start in autumn 2033.<\/p>\n<p>&#8211; The implementation planning carried out within the tramway alliance has laid a strong foundation for construction. The alliance model, in which all parties share common objectives, challenges and financial risk, is particularly well suited to such a large-scale, multi-phase project, says <strong>Juha Saarikoski<\/strong>, CEO of Turku Tramway Ltd and Chair of the Turku Tramway Alliance\u2019s Executive Committee.<\/p>\n<p>&#8211; It\u2019s great to be able to put our plans into practice now that we\u2019re officially moving into the construction phase following the signing of the agreement. Early next year, we\u2019ll begin renovating the Turku Cathedral Bridge, building a public transport corridor in the area and carrying out archaeological excavations. The project is due to be completed in late 2028, in time for Turku\u2019s 800th anniversary, explains Saarikoski.<\/p>\n<p>The Turku Tramway Alliance comprises, as clients, Turku Tramway Ltd and the City of Turku, GRK and NRC Group as the construction partners, and Ramboll and Sweco as the design partners. The Turku Tramway Alliance commenced operations in spring 2024 at the start of the detailed design phase.<\/p>\n<h3>Further information<\/h3>\n<ul>\n<li>Juha Saarikoski, Managing Director, Turku Tramway Ltd, tel. +358 40 336 0117<\/li>\n<li>Jouni Kek\u00e4le, Head of the Tramway Division, NRC Group, tel. +358 40 8621 802<\/li>\n<li>Jouko Viitala, Unit Manager, GRK Suomi Oy, tel. +358 40 538 1768<\/li>\n<li>Juha Siipo, Division Director, Infrastructure &amp; Transport, Sweco, tel. +358 40 076 4890<\/li>\n<li><span class=\"TextRun SCXW123714274 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW123714274 BCX8\">Peter Molin, Director, Infrastructure and transport<\/span><span class=\"NormalTextRun SCXW123714274 BCX8\">, Ramboll Finland Oy, tel. +358 40 752<\/span> <span class=\"NormalTextRun SCXW123714274 BCX8\">3667<\/span><\/span><span class=\"EOP Selected SCXW123714274 BCX8\" data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:276}\">\u00a0<\/span><\/li>\n<\/ul>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n\n\n<section class=\"news bg-yellow ptb-80 \">\n\t<div class=\"container arts overflow-hidden\">\n\t\t<div class=\"row justify-content-center\">\n\t\t\t<div class=\"col-12\">\n\t\t\n\t\t \n\t\t\t<div class=\"col-12 col-md-6\">\n\t\t\t\t<h2 class=\"section-title\">More news<\/h2>\n\t\t\t<\/div>\n\t\t\n\t\t<div class=\"row\">\n\t\t\t        <div class=\"col-12 col-md-6 col-lg-4 pb-2\">\n            <div class=\"hls h-100\">\n                <a class=\"link-arts\" href=\"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/\" aria-label=\"Read entire article:\">\n                    <div class=\"img-wrapper mb-3\" aria-hidden=\"true\">\n                        <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"360\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-1280x720.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" srcset=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-1280x720.jpg 1280w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-640x360.jpg 640w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-320x180.jpg 320w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-768x432.jpg 768w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-1536x864.jpg 1536w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                    <\/div>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"info-wrap\" aria-hidden=\"true\">\n\t\t\t\t\t\t<span class=\"blog-cat\">News<\/span><span aria-hidden=\"true\" class=\"date-separator\"> | <\/span>\n\t\t\t\t\t\t<span class=\"post-date pb-3\">\n\t\t\t\t\t\t\t28.9.2026\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\n                    <h3 class=\"post-hls-title pb-1\">The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed<\/h3>\n\n\t\t\t\t\t                    <p class=\"post-excerpt\" aria-hidden=\"true\">\n                                            <\/p>\n\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t<div class=\"mb-3\" aria-hidden=\"true\" style=\"margin-top: auto;\">\n\t\t\t\t\t\t<span class=\"link-read-more\">\n\t\t\t\t\t\t\tRead article\t\t\t\t\t\t<\/span>\n                \t<\/div>\n                <\/a>\n\n                \n            <\/div>\n        <\/div>\n                <div class=\"col-12 col-md-6 col-lg-4 pb-2\">\n            <div class=\"hls h-100\">\n                <a class=\"link-arts\" href=\"https:\/\/turunraitiotie.fi\/en\/refurbishment-of-turku-cathedral-bridge-to-alter-city-centre-traffic-in-2027-2028\/\" aria-label=\"Read entire article:\">\n                    <div class=\"img-wrapper mb-3\" aria-hidden=\"true\">\n                        <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"360\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/09\/Turun-Tuomiokirkkosillan-alue-kesalla-2026-1280x720.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"Kes\u00e4ll\u00e4 otettu kuva Tuomiokirkosta. Puut vihert\u00e4v\u00e4t. Kadulla ajaa autoja. Taivas on kirkas.\" srcset=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/09\/Turun-Tuomiokirkkosillan-alue-kesalla-2026-1280x720.jpg 1280w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/09\/Turun-Tuomiokirkkosillan-alue-kesalla-2026-640x360.jpg 640w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/09\/Turun-Tuomiokirkkosillan-alue-kesalla-2026-320x180.jpg 320w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/09\/Turun-Tuomiokirkkosillan-alue-kesalla-2026-768x432.jpg 768w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/09\/Turun-Tuomiokirkkosillan-alue-kesalla-2026-1536x864.jpg 1536w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/09\/Turun-Tuomiokirkkosillan-alue-kesalla-2026.jpg 2048w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                    <\/div>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"info-wrap\" aria-hidden=\"true\">\n\t\t\t\t\t\t<span class=\"blog-cat\">News<\/span><span aria-hidden=\"true\" class=\"date-separator\"> | <\/span>\n\t\t\t\t\t\t<span class=\"post-date pb-3\">\n\t\t\t\t\t\t\t10.9.2026\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\n                    <h3 class=\"post-hls-title pb-1\">Refurbishment of Turku Cathedral Bridge to alter city centre traffic in 2027\u20132028<\/h3>\n\n\t\t\t\t\t                    <p class=\"post-excerpt\" aria-hidden=\"true\">\n                        The refurbishment of Turku Cathedral Bridge will require the bridge to be closed to all traffic in 2027\u20132028. The decision to refurbish the bridge was made in connection with the Turku tramway decision in May 202&#8230;                    <\/p>\n\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t<div class=\"mb-3\" aria-hidden=\"true\" style=\"margin-top: auto;\">\n\t\t\t\t\t\t<span class=\"link-read-more\">\n\t\t\t\t\t\t\tRead article\t\t\t\t\t\t<\/span>\n                \t<\/div>\n                <\/a>\n\n                \n            <\/div>\n        <\/div>\n                <div class=\"col-12 col-md-6 col-lg-4 pb-2\">\n            <div class=\"hls h-100\">\n                <a class=\"link-arts\" href=\"https:\/\/turunraitiotie.fi\/en\/turku-tramway-alliance-gets-the-go-ahead-to-build-a-12-kilometre-tramway-line-in-turku-tram-services-will-resume-in-turku-in-2033\/\" aria-label=\"Read entire article:\">\n                    <div class=\"img-wrapper mb-3\" aria-hidden=\"true\">\n                        <img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-1280x960.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" srcset=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-1280x960.jpg 1280w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-640x480.jpg 640w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-320x240.jpg 320w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-768x576.jpg 768w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-1536x1152.jpg 1536w, https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/05\/TR_Paatosviestinta_4-3_EN-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>                    <\/div>\n\t\t\t\t\t\n\t\t\t\t\t<div class=\"info-wrap\" aria-hidden=\"true\">\n\t\t\t\t\t\t<span class=\"blog-cat\">News<\/span><span aria-hidden=\"true\" class=\"date-separator\"> | <\/span>\n\t\t\t\t\t\t<span class=\"post-date pb-3\">\n\t\t\t\t\t\t\t18.5.2026\t\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/div>\n\n                    <h3 class=\"post-hls-title pb-1\">Turku Tramway Alliance gets\u00a0the go-ahead\u00a0to build a 12-kilometre tramway line in Turku \u2013 tram services will resume in Turku in 2033<\/h3>\n\n\t\t\t\t\t                    <p class=\"post-excerpt\" aria-hidden=\"true\">\n                        Turku City Council has decided to commission the Turku Tramway Alliance to build a tramway in Turku. The tramway will be constructed in accordance with the Alliance\u2019s implementation plan and a binding target cost&#8230;                    <\/p>\n\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t<div class=\"mb-3\" aria-hidden=\"true\" style=\"margin-top: auto;\">\n\t\t\t\t\t\t<span class=\"link-read-more\">\n\t\t\t\t\t\t\tRead article\t\t\t\t\t\t<\/span>\n                \t<\/div>\n                <\/a>\n\n                \n            <\/div>\n        <\/div>\n        \n\t\t<\/div>\n\t\t\n\t\t\t\t<div class=\"py-3\">\n\t\t\t<a class=\"cta news-cta\" href=\"https:\/\/turunraitiotie.fi\/en\/homepage\/news\/\">\n\t\t\t\tAll news\t\t\t<\/a>\n\t\t<\/div>\n\t\t\n\t\t\n\t\t\n\t\t<\/div>\n\t<\/div>\n\t<\/div>\n<\/section>\n\n\n\n<div class=\"container paragraph-block\">\n<p class=\"wp-block-paragraph\"><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":9,"featured_media":7437,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[71],"tags":[],"class_list":["post-9130","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed - Turun raitiotie<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed - Turun raitiotie\" \/>\n<meta property=\"og:url\" content=\"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/\" \/>\n<meta property=\"og:site_name\" content=\"Turun raitiotie\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-28T12:44:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-28T13:17:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Saana Lehtinen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Saana Lehtinen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/\"},\"author\":{\"name\":\"Saana Lehtinen\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#\\\/schema\\\/person\\\/1c371c1db81af143be185ce8e00b646e\"},\"headline\":\"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed\",\"datePublished\":\"2026-09-28T12:44:42+00:00\",\"dateModified\":\"2026-09-28T13:17:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/\"},\"wordCount\":14,\"publisher\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/\",\"name\":\"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed - Turun raitiotie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg\",\"datePublished\":\"2026-09-28T12:44:42+00:00\",\"dateModified\":\"2026-09-28T13:17:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg\",\"width\":2560,\"height\":1440},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Etusivu\",\"item\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/\",\"name\":\"Turun raitiotie\",\"description\":\"Kasvavan kaupungin joukkoliikennett\u00e4 t\u00e4ytyy kehitt\u00e4\u00e4 isommin harppauksin. Suunnittelemme raitiotiet\u00e4 osaksi F\u00f6li\u00e4.\",\"publisher\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#organization\",\"name\":\"Turun Raitiotie\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/Raitiotie_Logo_keltainen_LOWRES.png\",\"contentUrl\":\"https:\\\/\\\/turunraitiotie.fi\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/Raitiotie_Logo_keltainen_LOWRES.png\",\"width\":300,\"height\":300,\"caption\":\"Turun Raitiotie\"},\"image\":{\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/turunraitiotie.fi\\\/en\\\/#\\\/schema\\\/person\\\/1c371c1db81af143be185ce8e00b646e\",\"name\":\"Saana Lehtinen\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/743d3fbf0e3961c8c46af6e3414c4a2fda8096cd9cd86c6c343b442bba0140f1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/743d3fbf0e3961c8c46af6e3414c4a2fda8096cd9cd86c6c343b442bba0140f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/743d3fbf0e3961c8c46af6e3414c4a2fda8096cd9cd86c6c343b442bba0140f1?s=96&d=mm&r=g\",\"caption\":\"Saana Lehtinen\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed - Turun raitiotie","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/","og_locale":"en_US","og_type":"article","og_title":"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed - Turun raitiotie","og_url":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/","og_site_name":"Turun raitiotie","article_published_time":"2026-09-28T12:44:42+00:00","article_modified_time":"2026-09-28T13:17:27+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg","type":"image\/jpeg"}],"author":"Saana Lehtinen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Saana Lehtinen","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/#article","isPartOf":{"@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/"},"author":{"name":"Saana Lehtinen","@id":"https:\/\/turunraitiotie.fi\/en\/#\/schema\/person\/1c371c1db81af143be185ce8e00b646e"},"headline":"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed","datePublished":"2026-09-28T12:44:42+00:00","dateModified":"2026-09-28T13:17:27+00:00","mainEntityOfPage":{"@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/"},"wordCount":14,"publisher":{"@id":"https:\/\/turunraitiotie.fi\/en\/#organization"},"image":{"@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/#primaryimage"},"thumbnailUrl":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/","url":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/","name":"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed - Turun raitiotie","isPartOf":{"@id":"https:\/\/turunraitiotie.fi\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/#primaryimage"},"image":{"@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/#primaryimage"},"thumbnailUrl":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg","datePublished":"2026-09-28T12:44:42+00:00","dateModified":"2026-09-28T13:17:27+00:00","breadcrumb":{"@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/#primaryimage","url":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg","contentUrl":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2026\/03\/Tuomiokirkkosilta-ilmakuva-1920px-scaled.jpg","width":2560,"height":1440},{"@type":"BreadcrumbList","@id":"https:\/\/turunraitiotie.fi\/en\/the-implementation-phase-of-the-turku-tramway-begins-the-alliance-agreement-has-been-signed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Etusivu","item":"https:\/\/turunraitiotie.fi\/en\/"},{"@type":"ListItem","position":2,"name":"The implementation phase of the Turku tramway begins \u2013 the alliance agreement has been signed"}]},{"@type":"WebSite","@id":"https:\/\/turunraitiotie.fi\/en\/#website","url":"https:\/\/turunraitiotie.fi\/en\/","name":"Turun raitiotie","description":"Kasvavan kaupungin joukkoliikennett\u00e4 t\u00e4ytyy kehitt\u00e4\u00e4 isommin harppauksin. Suunnittelemme raitiotiet\u00e4 osaksi F\u00f6li\u00e4.","publisher":{"@id":"https:\/\/turunraitiotie.fi\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/turunraitiotie.fi\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/turunraitiotie.fi\/en\/#organization","name":"Turun Raitiotie","url":"https:\/\/turunraitiotie.fi\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/turunraitiotie.fi\/en\/#\/schema\/logo\/image\/","url":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/06\/Raitiotie_Logo_keltainen_LOWRES.png","contentUrl":"https:\/\/turunraitiotie.fi\/wp-content\/uploads\/2024\/06\/Raitiotie_Logo_keltainen_LOWRES.png","width":300,"height":300,"caption":"Turun Raitiotie"},"image":{"@id":"https:\/\/turunraitiotie.fi\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/turunraitiotie.fi\/en\/#\/schema\/person\/1c371c1db81af143be185ce8e00b646e","name":"Saana Lehtinen","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/743d3fbf0e3961c8c46af6e3414c4a2fda8096cd9cd86c6c343b442bba0140f1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/743d3fbf0e3961c8c46af6e3414c4a2fda8096cd9cd86c6c343b442bba0140f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/743d3fbf0e3961c8c46af6e3414c4a2fda8096cd9cd86c6c343b442bba0140f1?s=96&d=mm&r=g","caption":"Saana Lehtinen"}}]}},"_links":{"self":[{"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/posts\/9130","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/comments?post=9130"}],"version-history":[{"count":2,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/posts\/9130\/revisions"}],"predecessor-version":[{"id":9141,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/posts\/9130\/revisions\/9141"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/media\/7437"}],"wp:attachment":[{"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/media?parent=9130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/categories?post=9130"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/turunraitiotie.fi\/en\/wp-json\/wp\/v2\/tags?post=9130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}